SJD-019
Sold Out
Local pick up only from BROOKVALE NSW 2100
Construction (Rig) | Extrusion |
---|---|
Material | Alloy |
Anodised | Yes |
Paint | No |
Colour | White |
Overall mast length measurement (X) | |
Fore & aft section measurement (Y) | 88mm |
Athwartships section measurement (Z) | 88mm |
Wall Thickness | 2.5mm |
Distance from mast step (butt) to deck (datum) |
|
Distance from datum to boom vang fitting |
|
Distance from datum to boom gooseneck fittting | 1.17m |
Distance from datum to1st spreader | 4.35m |
Distance from datum to 2nd spreader | 6.78m |
Distance from datum to 3rd spreader | |
Distance from datum to 4th spreader | |
Distance from datum to mast head | |
Distance from datum to topping lift sheave | |
Distance from datum to genoa sheave | |
Distance from datum to spin halyard sheave | 9.54m |
Distance from datum to main halyard sheave | |
Distance from datum to forestay attachment | 6.7m |
Distance from datum to backstay attachment | |
Distance from datum to lowers attachment | |
Mast track profile | |
Mast track sail slide part # | |
Distance from datum to spin pole car track | |
Length of pole car track | |
Pole track profile | |
Pole track slide part # | |
Sheaves scored for wire or rope | |
Sheave diameters |